BESS and Natural Gas Generator Power Facility – La Quinta, California

Project Overview

Electrical engineering from permit through construction for a battery and generator plant that is the primary source for a country club's irrigation pump house.

Our Scope

  • Fire and building plan-check responses

  • IFC bulletin revisions

  • Generator upsizing from 400 kW to 500 kW with SCR aftertreatment

  • Line-side interconnection design at the existing irrigation service

  • RFIs

  • Submittal reviews

  • Record drawings

“A site in Imperial Irrigation District territory, air district permitting for the generator, and a major equipment change after permit submittal.”
— The Challenge

Outcome

Site development permit, building permit, and fire permit approved. IFC Rev 0 in progress; air district approval pending.

 

Key Specifications

  • Flagship Role
    Electrical Engineer of Record

  • Battery
    One Tesla Megapack 2XL, 1,284 kWh

  • Generator
    One Caterpillar CG18 500 kW natural gas generator with SCR

  • Switchboard
    480/277 V three-phase

  • Services Provided
    Electrical design, permitting support, construction administration

  • Client
    Confidential

 