BESS and Natural Gas Generator Power Facility – La Quinta, California
Project Overview
Electrical engineering from permit through construction for a battery and generator plant that is the primary source for a country club's irrigation pump house.
Our Scope
Fire and building plan-check responses
IFC bulletin revisions
Generator upsizing from 400 kW to 500 kW with SCR aftertreatment
Line-side interconnection design at the existing irrigation service
RFIs
Submittal reviews
Record drawings
“A site in Imperial Irrigation District territory, air district permitting for the generator, and a major equipment change after permit submittal.”
Outcome
Site development permit, building permit, and fire permit approved. IFC Rev 0 in progress; air district approval pending.
Key Specifications
Flagship Role
Electrical Engineer of RecordBattery
One Tesla Megapack 2XL, 1,284 kWhGenerator
One Caterpillar CG18 500 kW natural gas generator with SCRSwitchboard
480/277 V three-phaseServices Provided
Electrical design, permitting support, construction administrationClient
Confidential